-
Notifications
You must be signed in to change notification settings - Fork 230
Pull requests: openshift/microshift
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
USHIFT-7168: Bump Go to 1.26
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
verified
Signifies that the PR passed pre-merge verification criteria
#6796
opened Jun 3, 2026 by
pmtk
Member
Loading…
[release-4.19] USHIFT-7058: Use small OLM catalog for test stability
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
verified
Signifies that the PR passed pre-merge verification criteria
#6795
opened Jun 3, 2026 by
pmtk
Member
Loading…
USHIFT-6799: C2CC: Latency measurement between clusters
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6794
opened Jun 3, 2026 by
pmtk
Member
Loading…
USHIFT-6801: C2CC: IPSec test
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6792
opened Jun 2, 2026 by
pmtk
Member
Loading…
PERFSCALE-2104: Enable and apply fieldalignment linter
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ready-for-human-review
Indicates a PR has been reviewed by automated tools and is ready for human review
#6789
opened Jun 2, 2026 by
sjug
Contributor
Loading…
HOLD: [release-4.22] Test drive KAS pre-hook patch
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#6788
opened Jun 2, 2026 by
copejon
Contributor
Loading…
USHIFT-6951: Add metrics exporters as optional MicroShift components
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
USHIFT-6849: Add C2CC IPv6 tests scenarios
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6750
opened May 27, 2026 by
vanhalenar
Contributor
Loading…
USHIFT-6746: migrate 23 OTP router tests to Robot Framework
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
USHIFT-6401: Patch unbounded KAS context to break pre-hook deadlock
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6635
opened May 7, 2026 by
copejon
Contributor
Loading…
USHIFT-6925 USHIFT-6851: Introduce Post-Quantum Curves to Ingress defaults and FIPs detection
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6622
opened May 4, 2026 by
eslutsky
Contributor
Loading…
Cert-manager create ca-bundle configmap for trust-manager
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
USHIFT-6639: Introduce test dynamic scheduling
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6371
opened Mar 18, 2026 by
pacevedom
Contributor
Loading…
OCPEDGE-2038: Add promote-learner command
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ProTip!
Type g p on any issue or pull request to go back to the pull request listing page.